Southern Synergy has provided engineering and design services for client projects across a wide variety of industries from $5,000-$6,500,000,000 total installed project cost. SSI’s specific scope of work for these projects ranging from $750-$2,000,000. As a growing mid-size firm with low overhead, we can provide the technical expertise and the personal level of service required to assist your team in successfully completing most projects.
We fully respect and appreciate our client’s confidentiality arrangements and cannot identify specific client projects. For specific client references please contact us at
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
. The below table lists just a few of the successfully completed projects SSI has assisted clients with.
| Facility | Project Description | Services |
| Titanium Production | 6000' Pipe Bridge | Mechanical, Electrical, Civil |
| Oil Refining | P&ID Verification | Mechanical |
| Oil Refining | Cat Cracker Expansion | I/E Project Eng, Electrical/Inst |
| Titanium Tetrachloride | Production and Purification Column | Process Design, +/-10% AFE Development |
| Oil Refining | Process Hazard Analysis | Lead/Facilitate HAZOP/PHA |
| Cobalt Production | Process Safety Management | Development and Implementation of Grassroots PSM Program |
| Fluorochemical | Polymer Mix Tank Addition | Mechanical, Electrical |
| Film Production | Railcar Receiving and Unloading | Civil, Structural, Mechanical Design |
| Oil Refining | P&ID Development | PSM Field Verification |
| Petrochemical | Process Hazard Analysis | PSM Facilitation |
| Hydrogen Peroxide | Bag House System Analysis & Upgrade | Mechanical Design, Optimization Study |
| Tungsten Production | Miscellaneous Projects | Mechanical Project Engineering |
| Fiber Production | R&D Polymer Laboratory | Mechanical, Electrical |
| Fluropolymers | Process Byproduct Recovery | Process Design, +/-10% AFE Development |
| Petrochemical | Safety Instrumented Systems (SIS) study | Engineering |
| Petrochemical | Installation Of 400 HP Air Compressor | Mechanical, Electrical |
| Fiber Production | Fiber Production Pilot Operations Unit | Detailed Design, Fabrication of Skid Unit |
| Petrochemical | Plant Blast Area Classification | Design Services |
| Petrochemical | Filter Colum | Detailed Design, +/- 10% AFE Development |